Our team has been on a roll. The second floor has been boarded and Tyvek-ed; all it needs now are shingles and the roof will be complete. See those boxes in the far right gable? Those are windows. And they’ve even framed some of the interior walls up there.
Here’s the back of the house, which has never quite had a second floor before. The master bedroom is on the other side of that wall.
Right now the contractor thinks he’ll be able to finish the roof, windows and siding sometime this week. So we’ll have more pictures soon!